From agreed drawings to a controlled data pack
How PLC Automator turns control drawings into reviewed tag data
From agreed drawings and rules to a controlled, engineer-reviewed data pack.
The four-step workflow
Define the job
Agree the drawing package, project rules, naming conventions and required export. The scope is fixed before any files are processed.
You choose which drawing types are in scope, the PLC and HMI/SCADA naming rules to apply, and the export format the downstream workflow expects.
Generate the draft
Extract draft PLC tags, descriptions, mappings and permitted alarm data with source references.
For each in-scope page, the system produces draft records linked back to the drawing evidence. It does not invent missing information or complete incomplete sequences.
Review exceptions
Engineers inspect uncertain, incomplete or non-conforming records before approval.
Ambiguous addresses, rule conflicts and missing labels are surfaced as review items. Each exception keeps a reference to the source evidence so engineers can decide quickly.
Export controlled data
Produce the agreed CSV/Excel data pack for the tested downstream workflow.
Only approved records are included. The output is a controlled draft data pack, not a deployed or final engineering deliverable.
Product scope
Tag Data Pack
Candidate PLC tags, descriptions, naming-rule results, source references, exceptions and agreed CSV/Excel export.
Documentation Pack
FAT, SAT, or commissioning documentation generated from source-referenced project data, when validated for the customer workflow.
Code Block Pack
Custom STL/LDR/FBD/other code blocks built on extracted tags — alarms/interlocks/general, engineer-reviewed, never autonomous safety or process-alarm design.
Example output
From a fictional schematic source to a draft record, exception and approved export.
1. Schematic source page
2. Draft tag record
3. Exception / review queue
Instrument tag ending in 111 conflicts with the customer rule to reserve 110–119 for flow loops. Engineer review required.
Engineer review requiredAddress token found without a corresponding field descriptor. Requires confirmation before export.
Engineer review required4. Approved export
| Tag | Description | Type | Address | Status |
|---|---|---|---|---|
| P1_FIT100 | PUMP 1 SUCTION FLOW TRANSMITTER | Analog input | %MW100 | Approved |
| P1_P101 | PUMP 1 STARTER RUN COMMAND | Digital output | %M0 | Approved |
| P1_LS100 | PUMP 1 HIGH LEVEL SWITCH | Digital input | %M1 | Approved |
Illustrative synthetic example — not a customer drawing.
PLC Automator does not deploy PLC code, connect to live OT systems or make unreviewed safety/process decisions.